"Providing Hometown Reliability"
Southwest Lift Station
The Southwest Lift Station has three 125 hp Aurora sewage pumps rated at 130' of head. The capacity of this lift station is 2,100 gallons per minute (3.0 mgd) (1 pump), or 3000 gal./min (4.3 mgd) with 2 pumps.
The building is a concrete block structure originally built in the early 1970's when the Wilson Meat Plant came to Marshall. It is located on Fairgrounds Road west of the Hospital.
North Miami Lift Station
The North Miami Lift Station has two Ebara submersible grinder pumps with a design capacity of 144,000 gallons per day (100 gpm). It is located on North Miami and Darling Street.
North Conway Lift Station
The North Conway Lift Station has two Paco pumps and related electrical equipment. The capacity of this lift station is 288,000 gallons per day (200 gpm). It is located north of State Street at the end of North Conway.
North English Lift Station
The North English Lift Station is set up with two Allis Chalmer pumps and related equipment. The station capacity is 936,000 gallons per day (650 gpm). It is located north of Ridge Street at the end of North English.
Stone Hedge Lift Station
The Stone Hedge Lift Station has two 7.5 Flygt duplex grinder pumps with each pump's capacity rated at 70 gpm. The pumps discharge into approximately 1,500 feet of three-inch PVC force sewer main. Approximately 2,500 feet of 8" PVC sewer main flows into this lift station that will serve 51 residential lots, 5 duplex lots, and golf clubhouse and restaurant.