Marshall Municipal Utilities

"Providing Hometown Reliability"

Main Menu

  • Home
  • About MMU
  • Customer Service
  • Electricity
  • Water
  • Wastewater
  • »Wastewater Collection
  • »»Lift Stations
  • »»Inflow and Infiltration
  • »Wastewater Treatment
  • »»Treatment Process
  • »»»Raw Sewage Pump Building
  • »»»Grit Removal & Preaeration Building
  • »»»Primary Clarifiers
  • »»»Aeration Basin Pump Station
  • »»»Aeration Basins
  • »»»Final Clarifiers
  • »»»Cascade Aerator
  • »»»Sludge Treatment & Removal
  • Natural Gas
  • Internet
  • Rates
  • Conservation and Safety
  • Sale Items
  • Site Map

Final Clarifiers

Final Clarifier

Final Clarifier

The Final Clarifiers are designed to allow sludge to settle while the clean water is discharged to the receiving stream. We have three finals, and they operate in parallel fashion. Like the aeration basins, there is a splitter that divides the stream equally. The settled sludge is removed from the basins by gravity and flows to the RAS pump wet well. Excess or waste activated sludge (WAS) is removed from these basins and transferred to the sludge holding basins by gravity flow. In 1998, we installed an inline MAG flow meter on the waste line so that we can better track how much sludge we are wasting from the system.

Splitter

Splitter

Marshall Municipal Utilities
75 East Morgan
Marshall, MO 65340
Phone: (660)886-6966
Fax: (660)886-6724
E-mail: mmu@mmumo.net
Kyle Gibbs, General Manager

eXTReMe Tracker