"Providing Hometown Reliability"
Unit 1 is a 1.5 MW steam turbine that was installed in 1935. It has not been used since 1967. Unit 2 is a 2.5 MW steam turbine that was installed in 1936 and retired in 1971. It is possible that the turbines and generators for these two units could be refurbished for future needs. A complete disassembly and inspection would be needed to verify this possibility. These units are being evaluated for removal.