| Generating Capacity | |
|---|---|
| Unit 3 | 4.0 MW |
| Unit 4 | 6.0 MW |
| Unit 5 | 16.5 MW |
| Unit 6 | 15.2 MW |
| Unit 7 | 1.0 MW |
| Unit 8 | 1.0 MW |
| Unit 9 | 1.0 MW |
| Unit 10 | 6.3 MW |
| Unit 11 | 6.3 MW |
| Total Capacity | 57.3 MW |
The Municipal Utilities Power Plant, located near Miami and North Streets, was constructed in 1919, but with additions over the years, the electrical generating system is quite able to meet the present needs. Our goal is to always have the capability to exceed the needs of Marshall during peak demand periods. Expansion over the years has increased capacity to 57.3 MW. The charts below show the generating capacity of the various MMU generators, and our historic net peaks.
Peak net load 1993 = 37,719 KW, 4:00 p.m., Tuesday, 8/17/93
Peak net load 1994 = 35,952 KW, 5:00 p.m., Wednesday, 7/6/94
Peak net load 1995 = 39,447 KW, 4:00 p.m., Monday, 8/14/95
Peak net load 1996 = 39,924 KW, 4:00 p.m., Friday, 7/19/96
Peak net load 1997 = 40,786 KW, 4:00 p.m., Friday, 7/25/97
Peak net load 1998 = 41,200 KW, 3:00 p.m., Tuesday, 8/18/98
Peak net load 1999 = 43,500 KW, 4:00 p.m., Thursday, 7/29/99
Peak net load 2000 = 45,340 KW, 4:00 p.m., Thursday, 8/31/00
Peak net load 2001 = 42,479 KW, 2:00 p.m., Tuesday, 7/24/01
Peak net load 2002 = 39,300 KW, 5:00 p.m., Tuesday, 7/9/02
Peak net load 2003 = 42,401 KW, 4:00 p.m., Thursday, 8/21/03
Peak net load 2004 = 42,019 KW, 4:00 p.m., Tuesday, 7/13/04
Peak net load 2005 = 41,401 KW, 4:00 p.m., Wednesday, 8/10/05
Peak net load 2006 = 42,661 KW, 5:00 p.m., Monday, 7/17/06
Peak net load 2007 = 41,128 KW, 5:00 p.m., Wednesday, 8/15/07
Historic peak net load to date = 45,340 KW, Thursday, 8/31/00